Mixed integer linear programming models to measure the economic impact of Zero-Buffers in Heijunka Flow Shop Scheduling

Número

Sección

Artículos
  • Joaquín Bautista-Valhondo ETSEIB Universitat Politècnica de Catalunya Av. Diagonal 647, 08028, Barcelona
  • Rocío Alfaro-Pozo ETSEIB Universitat Politècnica de Catalunya Av. Diagonal 647, 08028, Barcelona

DOI:

https://doi.org/10.37610/dyo.v0i82.663

Publicado

01-04-2024

Resumen

A classic production line for mixed models with a fixed cycle time is transformed into a flowshop by removing the time restrictions at the workstations. In the new production line, the Heijunka concept of Just in Time manufacturing is applied, imposing on the sequences of products that they preserve the production mix through linear constraints. In this work, we propose a MILP model for the new problem which is solved with the IBM-CPLEX solver using the set of 23 Nissan-9Eng.I instances. It is concluded that the economic impact due to production losses is very significant when the buffers between the stations of the engine production line are suppressed (1224 €/day), while the economic impact generated by Heijunka is negligible (9.83 €/day) compared to the economic and management advantages it offers.

Palabras clave:

Flowshop scheduling problem, Heijunka, IBM-CPLEX, Just in Time, Mixed integer linear programming, Mixed model sequencing problems, Production assembly lines

Agencias de apoyo

No

Descargas

Los datos de descarga aún no están disponibles.